LBSCR 4-Wheeled Third 2343
Fully re-varnished and now bagged up for the winter. Carriages which will be out of use for the winter months are covered with a protective tarpaulin 'bag' to protect the bodywork from weather damage. This is a chore that will disappear when the Rolling Stock Storage building is constructed.
LBSCR Third 2403
During October 2010 work proceeded steadily on fitting out the underframe with the pipe work for the braking system and the steam heating completed. Sunday 24 October saw another milestone in the restoration project when the body was placed temporarily on the overhauled underframe. All Up side roof boards have been removed, cleaned and replaced. The Down side roof is near completion. Flooring has been progressed and a start has been made on the tip up seat for the disabled compartment. Preparation for internal coatings and the installation of Down side fixed lights continues.


LBSCR Third 2416
"B" Exam carried out.
LCDR 4-Wheeled Third 2515
Bagged up for the winter.

LCDR 4-Wheeled Brake Third 4112
In works from 22 to 29 November 2010. Fully re-varnished and the Guard's Van ceiling re-glossed. "B" Exam carried out.
SECR Brake Third 4145
"B" Exam carried out.
SECR Brake Third 4149
Now waiting outside the works for space to allow the body to be transferred to the accommodation underframe.
LBSCR Brake Third 4168
The wheel sets from the underframe acquired from Brechin have been needle gunned, cleaned and painted. On 25 October the first bogie was taken into works for the wheel sets to be changed and the bogie and its brake gear to be reassembled. Suspension links are also receiving attention. As soon as the Country end bogie is completed it will be re-fitted and the London end bogie brought into works. New buffer brackets riveted together and the Country end brackets have been riveted in place, along with a drawbar strengthening plate. Country end air and steam heat pipes have been re-fitted and the Guard's heater re-connected.

NLR 4-Wheeled Composite 6336
In works from 8 to 15 November 2010. Fully re-varnished and now bagged up for the winter.
LBSCR Composite 6349
"B" Exam carried out.
LCDR 4-Wheeled Composite 6369
In works from 15 to 22 November 2010. Fully re-varnished. "B" Exam carried out.
SECR Composite 6375
"B" Exam carried out.
LCDR 4-Wheeled Composite 6378
In works from 1to 8 November 2010. Fully re-varnished and now bagged up for the winter.

LBSCR 10T Open Goods Wagon – 27834
Now on its own wheels. Work continues on various brackets and plates.


BR 13T Single Bolster, ex-Lowfit DB 453374
Entered works on 14 December 2010 for tidying up and application of wood preservative to the timber decking.

LBSCR 10T Covered Goods, ex-Cattle Wagon 46924
In the works for a new door to be made and fitted.